Ç° ¸í
¾Ë¹Ì´½ ºí·Ï Ç׿ÂÁ¶
¸ðµ¨¸í
DTU-1C
Á¦Á¶±¹
JAPAN
Á¦Á¶»ç
TAITEC
< Aluminium Block Bath >

    Á¦Ç° »ç¾ç
 
 - »ç¿ë ¿Âµµ ¹üÀ§ : ½Ç¿Â£«5¡É~£«200¡É
          
 - ¿Âµµ Á¤¹Ðµµ : ¡¾0.08~0.10¡É
 
 - ¿­¸Åü : ¾Ë·ç¹Ì´½ ºí·Ï¡¿1(±³È¯ °¡´É)
 
 - ºÎ°¡±â´É : ON/OFF ŸÀ̸Ó
 
 - ¿ÜÇü Ä¡¼ö : 210¡¿318¡¿130Hmm
    ¿ëµµ ¹× Ư¡

 - DNA¡¤RNAÀÇ ÃßÃâ, º¯¼º
 
 - DNAÀÇ Á¦ÇÑ È¿¼Ò ¹ÝÀÀ, ¼ö½Ä È¿¼Ò ¹ÝÀÀ
 
 - ´ç¡¤´Ü¹éÁú¡¤Áö¹æ»êµîÀÇ °¡¼öºÐÇØ
 
 - È¿¼ÒÀÇ ½ÇÈ°
 
 - ¿ë¸Å·ù°Å
    Á¦Ç° »ó¼¼ Á¤º¸

A. Features;

1. Excellence temperature accuracy equivalent to a Water Bath
2. Suitable for chemistry, biochemistry and molecular biology
3. DNA digestion, Sample concentration, Hydrolysis of sugar, protein and fatty acid
4. Newly developed - sensor Block method(PAT.P)¢¦makes it possible to setting temperature very quickly, Simple temperature setting and clean digital display
5. Uniform temperature distribution.
The plate heater controlled by-sensor Block method¢¦produces uniform temp. distribution and running time throughout the plate
6. For evaporation of solvent by N2 gas for evaporation of ethanol after steroid extraction of preventing oxidation of samples.
7. Positioning of the unit can be adjustable by sliding it allows the pole and simple puging for nozzles.

B. Specifications;

1. Temperature range : RT+5¡É¢¦+200¡É
2. Temperature Precision : ¡¾0.08¡É¢¦+0.1¡É
3. Temperature Controller : Thermoster/P1 zerocross control
4. Temperature Setting Method : Ten-key (0¢¦9 push button)
5. Temperature Setting Min Unit : 0.1¡É
6. Temperature Display : LED Digital(Temp. setting/Probe Temp. variable)
7. Heater : 180 Watt
8. Timer : (¢¦99 hour 59min), on-off
9. Safety : High temp. over current
10. Operation Safety : Over heat, Ideal sensor
11. Nozzle Capacity : 8, 11, 12, 13§®(36 hole)

12. Nozzle size : (outdia) ©ª2§® ¡¿ (india) ©ª1§® ¡¿ (length)100§®
13. Weight : approx. 4 §¸
14. Current : AC 100V, 2A


C. Accessories

1. Aluminum Block 1.5§¢ AL-1625 1 EA
2. 2P Concent Connector 1 EA
3. Handle 1 EA
4. E1 - 36 Evaporation Unit (optional) 1 KIT


D. Remark

1. Installation & operation should be performed by supplier.
2. One year warranty service should be provided by supplier.